Main Article Content

Abstract

The program is implemented in Pungguk Beringin Merigi Kelindang Bengkulu Tengah.
The purpose of this program is to provide the knowledge and skills of rural communities
Pungguk Beringin on utilization Hydraulic ram. Participants were representatives of
community activities. The solution provided is the application of Parallel Methods
Hydraulic ram. Through this program generated installation Hydraulic ram diameter of 2
inches with 10 liters of effluent water discharge to drain the water to a height of 50 meters
by 150 meters.
Keywords: Hydraulic ram pump, Parallel Methods, Pungguk Beringin

Article Details

How to Cite
., I., ., S., & ., S. (2017). PENERAPAN POMPA HIDRAM METODE PARALEL DI DESA PUNGGUK BERINGIN BENGKULU TENGAH. Dharma Raflesia : Jurnal Ilmiah Pengembangan Dan Penerapan IPTEKS, 12(2). https://doi.org/10.33369/dr.v2i12.3423

References

  1. BPS Benteng, 2013, Bengkulu Tengah Dalam Angka, Karang Tinggi, Bengkulu.
  2. Hari, H dan Heru, D.W., 2006,
  3. Rancang Bangun Pompa Hidram Untuk Masyarakat
  4. Pedesaan
  5. , JAI, BPPT.
  6. Irkhos dkk, 2012,
  7. Desain Pompa Hidram Paralon, Laboratorium Fisika FMIPA UNIB.
  8. Irkhos dkk, 2011,
  9. Pemanfaatan Pompa Hidram Sebagai Solusi Kesulitan Air di
  10. Kecamatan Bermani Ulu Raya Kabupaten Rejang Lebong
  11. , Jurnal Darma Raflesia
  12. LPPM UNIB.
  13. Ireng, S. A dan Julian, A, 2004,
  14. Pompa Hidram Untuk Kebutuhan Petani di Daerah
  15. Berbukit
  16. , Jurnal Traksi, 2004, Vol. 2, No. 1.
  17. Suarda, M dan Irawan, IKG, 2008,
  18. Kajian Eksperimental Pengaruh Tabung Udara pada
  19. Head Tekanan Pompa Hidram
  20. , Jurnal Ilmiah Teknik Mesin, CAKRAM, Vol. 2
  21. No.1 pp:10-14.
  22. Yeni, H dkk, 2009,
  23. Panjang Pipa Inlet Terhadap Efisiensi Pompa Hidram, Jurnal
  24. Dinamika, Teknik Sipil UMS.