Main Article Content
Abstract
The research is to analysis the effect of reducing manpower for production process railroad bridge WTT46.5 type. The purposed manpower reduction is to increased effective production process railroad bridge WTT46.5 type and reduction manpower cost. Reduction of Manpower happened in trial process with the number 15 people and separated in some part. On of the part is in welder that is reduction in one person. Manpower reduction in trial process to improve company finance by Rp. 4.645.620,00 in every project.
Keywords
manpower
railroad bridge
trial process
Article Details
License
References
- Fatkhurrohman, Arief, ”Penerapan Kaizen Dalam Meningkatkan Efisiensi Dan Kualitas Produk Pada Bagian Banbury PT Bridgestone Tire Indonesia”,Jurnal Administrasi Kantor, Bekasi Timur, 2016.
References
Fatkhurrohman, Arief, ”Penerapan Kaizen Dalam Meningkatkan Efisiensi Dan Kualitas Produk Pada Bagian Banbury PT Bridgestone Tire Indonesia”,Jurnal Administrasi Kantor, Bekasi Timur, 2016.