Construction delays are a common and major concern in most construction projects. Construction project delay can indirectly affect of project performance. Delay resolve method is to schedule crashing with various methods. This crashing planning is done by combining the Critical Path Method (CPM) and Time-Cost Trade-Off (TCTO) method for the minimum cost in crash duration calculation. Project A data is used to be a case studi in crash duration calculation and costs increase. Rescheduling with CPM result project completion time 120 days and after crashing project duration becomes 94 days, there was a reduction 26 days project completion time. Crashing programme are do to 18 activities from 30 critical activies rescheduling with CPM result. Total project costs changes is Rp. 19.923.466,- due working time addition (overtime) to reduce project time with Time Cost Trade Off method. Normal condition project costs is Rp. 985,171,182.52 and after duration crash becomes Rp. 1,005,094,648, -.
Article Details
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).
- This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
References
- Ervianto, W. I., 2004, Teori Aplikasi Manajemen Proyek Konstruksi, Penerbit Andi, Yogyakarta
- Kajatno, S., 1977, Uraian Lengkap Metode Network Planning, Jilid 1 – 3, Jajaran Penerbit Pekerjaan Umum
- Setyorini, A. D., dan A. K. Wiharjo, 2005, Optimasi Waktu dan Biaya dengan PDM pada Proyek Solo Grand Mall, Tugas Akhir, Fakultas Teknik, Teknik Sipil, Universitas Diponegoro, Semarang
References
Ervianto, W. I., 2004, Teori Aplikasi Manajemen Proyek Konstruksi, Penerbit Andi, Yogyakarta
Kajatno, S., 1977, Uraian Lengkap Metode Network Planning, Jilid 1 – 3, Jajaran Penerbit Pekerjaan Umum
Setyorini, A. D., dan A. K. Wiharjo, 2005, Optimasi Waktu dan Biaya dengan PDM pada Proyek Solo Grand Mall, Tugas Akhir, Fakultas Teknik, Teknik Sipil, Universitas Diponegoro, Semarang