[1]
2024. OPTIMASI WAKTU DAN BIAYA PROYEK KONSTRUKSI GEDUNG DENGAN METODE TIME COST TRADE OFF (Studi Kasus Proyek Non Struktur Gedung Perkantoran Tiga Lantai Tahap Lanjutan di Kota Bengkulu). Inersia: Jurnal Teknik Sipil. 16, 1 (May 2024), 29–41. DOI:https://doi.org/10.33369/ijts.16.1.29-41.