[1]
Oktaviani, C.Z., Majid, I.A. and Risdiawati, R. 2019. PERCEPATAN WAKTU PELAKSANAAN PEKERJAAN KONSTRUKSI DENGAN METODE CPM DAN TCTO. Inersia: Jurnal Teknik Sipil. 11, 1 (Sep. 2019), 33–40. DOI:https://doi.org/10.33369/ijts.11.1.33-40.