ALFAYED, I.; SUPRIANI, F.; GUNAWAN, A. OPTIMASI WAKTU DAN BIAYA PROYEK KONSTRUKSI GEDUNG DENGAN METODE TIME COST TRADE OFF (Studi Kasus Proyek Non Struktur Gedung Perkantoran Tiga Lantai Tahap Lanjutan di Kota Bengkulu). Inersia: Jurnal Teknik Sipil, [S. l.], v. 16, n. 1, p. 29–41, 2024. DOI: 10.33369/ijts.16.1.29-41. Disponível em: https://ejournal.unib.ac.id/inersiajurnal/article/view/33233. Acesso em: 26 apr. 2025.