“OPTIMASI WAKTU DAN BIAYA PROYEK KONSTRUKSI GEDUNG DENGAN METODE TIME COST TRADE OFF (Studi Kasus Proyek Non Struktur Gedung Perkantoran Tiga Lantai Tahap Lanjutan Di Kota Bengkulu)”. Inersia: Jurnal Teknik Sipil 16, no. 1 (May 3, 2024): 29–41. Accessed July 1, 2025. https://ejournal.unib.ac.id/inersiajurnal/article/view/33233.