1.
OPTIMASI WAKTU DAN BIAYA PROYEK KONSTRUKSI GEDUNG DENGAN METODE TIME COST TRADE OFF (Studi Kasus Proyek Non Struktur Gedung Perkantoran Tiga Lantai Tahap Lanjutan di Kota Bengkulu). IJTS [Internet]. 2024 May 3 [cited 2025 Jul. 1];16(1):29-41. Available from: https://ejournal.unib.ac.id/inersiajurnal/article/view/33233