1.
Alfayed I, Supriani F, Gunawan A. OPTIMASI WAKTU DAN BIAYA PROYEK KONSTRUKSI GEDUNG DENGAN METODE TIME COST TRADE OFF (Studi Kasus Proyek Non Struktur Gedung Perkantoran Tiga Lantai Tahap Lanjutan di Kota Bengkulu). IJTS [Internet]. 2024 May 3 [cited 2025 Apr. 18];16(1):29-41. Available from: https://ejournal.unib.ac.id/inersiajurnal/article/view/33233