PUTRI, A. A.; PRATAMA , Y. A.; GINTING, E.; ABRAR, N. Analysis of Construction Operations for The Development of High Speed Railway Jakarta-Bandung (Project Team Section 3 using The Cement Fly- Ash Gravel Pile Methode). PENDIPA Journal of Science Education, [S. l.], v. 9, n. 2, p. 530–536, 2025. DOI: 10.33369/pendipa.9.2.530-536. Disponível em: https://ejournal.unib.ac.id/pendipa/article/view/43533. Acesso em: 2 aug. 2025.