[1]
A. A. Putri, Y. A. Pratama, E. Ginting, and N. Abrar, “Analysis of Construction Operations for The Development of High Speed Railway Jakarta-Bandung (Project Team Section 3 using The Cement Fly- Ash Gravel Pile Methode)”, pendipa. jurnal. pendik. sains, vol. 9, no. 2, pp. 530–536, Jul. 2025.