PENERAPAN POMPA HIDRAM METODE PARALEL UNTUK MENGATASI PERMASALAHAN AIR

Irkhos Irkhos(1), Suhendra Suhendra(2), Sukisno Sukisno(3),
(1) Jurusan Fisika FMIPA Universitas Bengkulu, Indonesia
(2) Jurusan Fisika FMIPA Universitas Bengkulu, Indonesia
(3) Ilmu Tanah FP UNIB, Indonesia

Sari


The program is implemented in Pungguk Beringin Merigi Kelindang Bengkulu Tengah. The purpose of this program is to provide the knowledge and skills of rural communities in Pungguk Beringin on utilization Hydraulic ram. Participants were representatives of community activities. The solution provided is the application of Parallel Methods Hydraulic ram. Through these program, installation Hydraulic ram diameter of 2 inches can be generated about 10 liters of effluent water in each minute with to a height of 50 meters and

250 meters from water source. Some factors that can affect to this achievement are water capacity, topography, and people participation.

 

Keywords: Hydraulic ram pump, Parallel Methods, Pungguk Beringin

 

 

 


Referensi


BPS Kabupaten Bengkulu Tengah, 2013, Bengkulu Tengah Dalam Angka, Bengkulu.

Hari, H dan Heru, D.W., 2006, Rancang Bangun Pompa Hidram Untuk Masyarakat Pedesaan, JAI, BPPT.

Irkhos, dkk., 2012, Desain Pompa Hidram Paralon, Laboratorium Fisika, FMIPA UNIB. Ireng, S. A dan Julian, A, 2004, Pompa Hidram Untuk Kebutuhan Petani di Daerah Berbukit, Jurnal Traksi, 2004, Vol. 2, No. 1

Suarda, M dan Irawan, IKG, 2008, Kajian Eksperimental Pengaruh Tabung Udara pada Head Tekanan Pompa Hidram, Jurnal Ilmiah Teknik Mesin, CAKRAM, Vol. 2 No.1 pp:10-14.

Yeni, H., dkk., 2009, Panjang Pipa Inlet Terhadap Efisiensi Pompa Hidram, Jurnal Dinamika, Teknik Sipil UMS.


Article Metrics

 Sari Views : 29 times

Refbacks

  • Saat ini tidak ada refbacks.


Copyright Dharma Raflesia 2017